1. Why the Go/No-Go Matters

The Go/No-Go checklist is the final decision tool before ignition. It confirms that conditions, permits, notifications, personnel, equipment, prescription, smoke requirements, contingency resources, and briefing requirements are in place before a test fire.

Training standard: If any required Go/No-Go answer is NO, implementation is not allowed. Stop, correct the issue, or postpone the burn.

2. Preliminary Questions

Before working the main checklist, the Burn Boss must decide whether conditions have changed since the prescription was developed.

A. Have conditions changed in or adjacent to the unit?
Examples include drought conditions, fuel loading changes, site changes, or risk factors not considered in the prescription.
Proceed to the Go/No-Go checklist.
Go to Question B. The plan may need review before implementation.
B. Has the plan been reviewed and an amendment approved, or has no amendment been deemed necessary?
Proceed to the checklist.
STOP: Implementation is not allowed. An amendment is needed.

3. Interactive Go/No-Go Checklist

Select YES or NO for each required item. The tool will automatically show the implementation decision.

4. Test Fire Decision

If all required checklist items are YES, conduct and document a test fire. The final decision is whether the burn can still be carried out according to the approved plan and meet the planned objective.

After evaluating the test fire, can the prescribed fire be carried out according to the plan?

5. Scenario Practice

Work through three Burn Boss decision scenarios.

Scenario 1: Forecast Shift

All resources are on site, but the updated spot forecast shows winds above the prescription maximum during the ignition window.

Scenario 2: Missing Notification

The Air Quality Management District and ECC were notified, but two adjacent landowners listed in the plan were not reached.

Scenario 3: Test Fire Looks Good

All checklist items are YES. The test fire shows expected flame length, spread, smoke lift, and holding resources are effective.

6. HTML Field Version

Use this field version on a tablet or laptop, then print or save as PDF.

ItemYESNONotes

7. Final Knowledge Check

Answer the questions below. Score 80% or higher to display a certificate.

Certificate of Completion

This certifies completion of the

Prescribed Fire Go/No-Go Checklist Interactive Training

Name: ____________________________

Date:

Score:

Stay Updated

Please fill the required field.

Let’s Get Social